PROJECT DESCRIPTION
Taylor is delivering Stage 2 of the development which links with the existing RACF and Stage 1 (Building A). This new stage comprises a 101 independent living apartment complex along with community spaces such as the pool pavilion, consultation rooms, hair & beauty salon and elevator access from the existing RACF to the pavilion.
The project scope encompasses:
- Recovery of site plaques/memorabilia from the existing building and hand over to the principal for safe keeping
- Demolition and site clearance
- Construction of 101 ILUs in Building B, C, and D
- Basement carpark under Building C and D
- Swimming pool and its enclosure
- Open terrace adjacent to the swimming pool
- Community facilities on level 4 on Building C
- Construction of a new lift at the rear of Bowden Brae Gardens to allow access to the facilities in Stage 2
- Site infrastructure, external works and landscaping
- Decommissioning of existing substation